Chinese Science Citation Database Core Library(CSCD)Source Journals
Chinese Core Journals
Chinese Core Science and Technology Journals
RCCSE China Authoritative Academic Journal(A+)
Dutch Digest and Citation Database (Scopus)

Schematic design and economic analysis of hydrogen co-firing for a peakingpower plant with hydrogen from renewable energy

2025 No. 03
91
54
OnlineView
Download
Authors:
WANG Tiantian
LIU Biao
JI Fan
YUAN Dian
YU Yangwanqing
ZOU Gang
HU Wenyu
YANG Fuyuan
OUYANG Minggao
Unit:
School of Vehicle and Mobility,Tsinghua University
Beijing SinoHytec Co.,Ltd.
Huaneng Xinjiang Energy Develop Co.,Ltd.,Urumqi
Abstract:

The proportion of renewable energy power generation in China has increased year by year. As renewable energy powergeneration,such as wind power and photovoltaic,is characterized by volatility,intermittency,and stochasticity,traditional thermal powerunits need to be highly flexible while deeply peaking to improve the capacity of renewable energy consumption. In this study,a hydrogenco-firing system for peaking power plants with hydrogen production from renewable energy is proposed. The schematic design of thesystem is carried out with a 350 MWe thermal power unit as an example,the technical economics of the system with different hydrogenblending ratios andpeaking loads are investigated. Then the impacts of the coal price,carbon tax,and hydrogen production tariffs on theelectricity cost per kWh of the peaking plant are analyzed,and the payback period of the project is discussed. The results show that furtherdeep adjustment of boiler load after hydrogen co-firing with an appropriate ratio has better economic benefits. If carbon tax and hydrogen production tariffs are not taken into account,and the coal price is calculated according to 800 yuan/t,the electricity cost without hydrogenco-firing (Scenario 1)is 0.347 yuan/kWh. Further deep adjustment of the boiler load to 20%THA after assisted comsbution with 20%hydrogen co-firing (Scenario 5) would control the electricity cost at an increase of 2.0%. When the coal price rises to over 1 800 yuan/tor the carbon tax rises to over 400 yuan/t CO2,the benefits of hydrogen co-firing in thermal power units in terms of coal saving and carbonreduction become increasingly significant,and the retrofitted scenarios start to dominate in terms of electricity cost per kWh. When thecoal price is 1 000 yuan/t and the carbon tax price is 100 yuan/t CO2 excluding the hydrogen production tariff,the payback period ofScenario 5 is the shortest,which is 10.65 years. If the coal price and carbon tax increase in the future,the economic benefit of hydrogen co-firing in thermal power units will be more significant.

Keywords:
renewable energy
hydrogen from electrolytic water
peaking power plants
hydrogen co-firing
schematic design
economic analysis
Citation format:
王天天(1996—),女,山东菏泽人,助理研究员,博士。E-mail:tjwangtiantian96@163.com
Chart:
--
Articles:
--
Citation format:
WANG Tiantian,LIU Biao,JI Fan,et al. Schematic design and economic analysis of hydrogen co-firing for a peakingpower plant with hydrogen from renewable energy[J].Clean Coal Technology,2025,31(3):54−61.

About Journal

  • Executive director

    China Coal Science and Industry Group Co., Ltd

  • Sponsored by

    Coal Science Research Institute Co., Ltd
    Coal Industry Clean Coal Engineering
    Technology Research Center

  • Editor in Chief

    XIE Qiang

  • Vice Editor-in-Chief

    YU Chang
    SHI Yixiang
    ZHAO Yongchun
    DUAN Linbo
    CAO Jingpei
    ZENG Jie

  • Publication Frequencies

    Monthly

  • ISSN

    1006-6772

  • CN

    11-3676/TD

Covered by

  • CSTPCD
  • RCCSE(A+)
  • AJ
  • EBSCO host
  • Ulrichsweb
  • JST
  • Scopus

Contact us

New Media

  • Meichuanmei
    Meichuanmei
  • Clean Coal Technology
    Clean Coal Technology
  • Online Journals
    Online Journals
Website Copyright © {year} Clean Coal Technology
京ICP备05086979号-19
地址:Coal Tower, Hepingli, Chaoyang District, Beijing, China.
邮编:100013
Tel:86-10-87986452 / 010-87986451
E-mail:jjmjs@263.net