洁净煤技术

2000, (04) 56-57

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Past Issue) | 高级检索(Advanced Search)

国华北京热电厂烟气脱硫工程竣工投产
The Flue Gas Desulfurization system put into Operation in Guohua Beijing Thermal Power Plant


Guohua Beijing Thermal Power Plant, Beijing 100025,China)

摘要(Abstract):

国华北京热电厂烟气脱硫工作 ,是全国第一家利用湿法脱除煤烟气中的二氧化硫并生产出石膏板的电厂 ,为创建绿色环保电厂创出一条新路
The flue gas wet desulfurization process is adopted in Guohua Beijing thermal Power Plant. The SO2 is removed from flue gas and to produce gypsum plate that is the first plant in whole country. It is a new way for established the green environment frendship power plant.

关键词(KeyWords): 热电厂;烟气脱硫
thermal power plant; flue gas desulfurizat(

Abstract:

Keywords:

基金项目(Foundation):

作者(Author):
Guohua Beijing Thermal Power Plant, Beijing 100025,China)

Email:

DOI: 10.13226/j.issn.1006-6772.2000.04.015

参考文献(References):

文章评论(Comment):

序号(No.) 时间(Time) 反馈人(User) 邮箱(Email) 标题(Title) 内容(Content)
反馈人(User) 邮箱地址(Email)
反馈标题(Title)
反馈内容(Content)
扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享